Architectural Review

For FLEHA Residents:

If you are considering any external additions, alterations, or changes to your property, please submit two printed/hard copies of your plans (an electronic/PDF version is also appreciated) to the HOA for review, before submitting them to Placer County. Please note that the County will not approve your plans until our HOA first approves them. Interior alterations to your house (e.g., bath remodel) do not require HOA review.

Before submitting plans to the HOA, please ensure that they do the following:

  • comply with our CC&Rs (see full version on “Legal Documents” page on this website, and “Architectural Control” excerpt below **);
  • comply with our setbacks (35′ from the front, 15′ from the side, and 25′ from the back);
  • and clearly delineate any drainage plans/changes.

Please begin your architectural review process by contacting info@fleha.org to arrange for the delivery of your plans to FLEHA’s Architectural Review Committee (“ARC”). They will review your plans, as will the Board of Directors, if necessary, so please allow sufficient time in your schedule for our process.  Once reviewed, the ARC will provide either a stamp of approval on your plans or a request for changes and/or additional information.

If you have additional questions about FLEHA’s architectural review process, please contact info@fleha.org.

Thank you!

** ARCHITECTURAL CONTROL

No building, fence, wall or other structure shall be commenced, erected or maintained upon the Properties, nor shall any exterior addition to or change or alteration therein be made until the plans and specifications showing the nature, kind, shape, height, materials, and location of the same shall have been submitted to and approved in writing as to harmony of external design and location in relation to surrounding structures and topography by the Board of Directors of the Association, or by an architectural committee composed of three (3) or more representatives appointed by the Board. In the event said Board, or its designated committee, fails to approve or disapprove such design and location within thirty (30) days after said plans and specifications have been submitted to it, approval will not be required and this Article will be deemed to have been fully complied with.